Should I Expand My Business Before the Crowds Arrive?
Downtown Fort Pierce has waited years for King’s Landing. Villas went up first on the old power plant site by the Indian River Lagoon, with a hotel and shops planned next. Then, in a July 2026 email reported that August, the hotel developer told the city it was about $15 million short. If you run a cafe on Second Street or a shop near the marina, that gap matters. Add seats now and you may pay rent on empty chairs. Wait too long and someone else gets the hotel crowd. Business consultant Dr. Paul Borosky, DBA, MBA, gives Fort Pierce owners two plans: one for a hotel that opens on time, and one for a hotel that slips.
Call or text (321) 948-9588. Your first 15-minute call is free.
Last Updated: November 2026
Doctor Owl in Plain English
Should I Spend Money Now on a Project That Isn’t Done?
Not all at once. Split the spending into small steps, and tie each step to something you can see happen, like a building permit or a hotel opening date. Spend on the first step only when its trigger shows up. That way a delay costs you time, not your savings. Before any of that, know your break-even month by month, so you can tell how long you can wait.
How This Guide WorksThis guide walks through what King’s Landing has done so far, the mistakes owners make while a big project is pending, and a three-step way to grow on your own schedule. Then Louie Waffles, who runs a bakery and cafe in the Fabled Forest, faces a new lodge that keeps not opening. More stories like Louie’s are in Dr. Paul’s Fabled Forest Business School Series.
The Problem
Why Is Downtown Fort Pierce Growth So Hard to Plan Around?
Because the big project keeps moving. King’s Landing has been in the works since 2019. A first developer’s deal fell through in 2023. A new partner broke ground in April 2025, and the first two villas were expected nine to ten months later. The hotel is a separate piece. In a July 2026 email, its developer told the city it was about $15 million short and asked for 180 more days to find private money.
- 2019Plans start for the old power plant site.
- 2023First developer’s deal falls through. Progress stalls.
- April 2025Groundbreaking on waterfront villas. First two due in nine to ten months.
- July 2026Hotel developer reports a gap of about $15 million and asks for 180 days.
- NextCity and redevelopment board decide on the extension. Hotel date still open.
Sources: WPTV, April 10, 2025; CBS12, August 5, 2026.
A project with no firm date is hard on small owners. You can’t hire for a crowd with no arrival date. Restaurants and cafes feel it most, because their costs show up every week whether the seats fill or not. See how regulars carry a restaurant through slow stretches in the restaurant regulars trend.
Dr. Paul’s Take
Two Budgets Beat One Big Bet
Owners near a big project pick an opening date in their heads and spend toward it. Then the date moves and the bills don’t. Dr. Paul’s view: never build your only plan around a date someone else controls. Keep a lean plan you can live on if the hotel slips, and a growth plan you switch on when the cranes show up. Mapping both versions of next year, with a spending limit for each, is what Dr. Paul’s strategic planning consulting is built for.
The Opportunity
What Will King’s Landing Bring to Downtown Fort Pierce Businesses?
More people living and staying downtown. The plan for the old power plant site overlooking the lagoon starts with luxury waterfront villas, then adds a hotel, more homes and commercial space. Villa owners need coffee, dinner, haircuts and home services. Hotel guests walk to whatever is close.
The owners who win are the ones already set up when the people arrive: a known name, a steady crew and room to add hours. That takes planning before the ribbon cutting, not after.
Common Mistakes
What Do Owners Get Wrong While a Big Project Is Pending?
Signing for space on the developer’s timeline
A lease starts on a date. The hotel may not. Owners who sign early carry extra rent for months with no new customers to pay it.
Better: ask for a later start date, a smaller first space, or an option on the space next door.
Waiting to do anything until the hotel opens
Then every nearby shop competes for the same new guests on the same day.
Better: build your regulars now. The villa owners move in first.
Planning one future instead of two
One plan assumes on time. Real life brings delays.
Better: write down what you do if it opens on time and what you do if it slips a year.
What to Do
How Can a Fort Pierce Owner Grow Without Betting on a Date?
Dr. Paul uses the three stages of Dr. Paul’s Organize-Plan-Grow™ Strategy to keep the risk small.
Know your break-even for a normal month and a slow month. Know how many months of costs you have in the bank.
Write two versions of next year: the hotel opens on time, or it slips. Give each version its own hiring date and its own spending limit.
Spend in steps. Add hours first, then staff, then space. Each step waits for a sign you can see on the street.
Still planning your first location? Downtown space can look cheap before a big project lands. Price your first year on today’s foot traffic, not the crowd you hope for.
Run the floor, not the books? Start a weekly count of customers by hour. When the crowd grows, that count tells the owner when to add a shift.
Doctor Owl Teaches
How Did Louie Waffles Get Ready for a Lodge That Kept Not Opening?
On the river dock, Doctor Owl was re-spooling the line on his fishing reel. Louie Waffles trotted down the boards with flour on his ears.
“They’re building a lodge on the point,” Louie said. “Big one. Travelers every night. I want to double my tables at Waffle Woofs before it opens.”
“When does it open?”
Louie’s tail slowed. “Spring. Or fall. The builders ran out of acorns and are asking the council for more time.”
Doctor Owl wound the reel. “Then let us plan for both seasons. How many slow weeks can the bakery carry right now?”
Louie did not know. That afternoon, his counter helper went through the bakery’s ledger with him. Louie could carry about six slow weeks before he had to dip into savings. Twice as many tables would cut that to three.
So Louie made two lists. One said what he would do if the lodge opened in spring. The other said what he would do if it slipped a year. Both started the same way: win the neighbors first. The new cottages by the point already had families in them.
He added one early breakfast hour instead of new tables. He gave the cottage families a punch card. “On the house!” he said, handing out the first waffle, and this time the free waffle had a job to do.
The lodge did not open in spring. Louie’s early hour was full anyway, and the extra tables waited until the builders found their acorns.
The lesson: when a big project has no firm date, grow in small steps you can afford either way, and win the customers who are already there.
Illustration only. Louie’s lodge is make-believe; the King’s Landing wait is not.
What Do Fort Pierce Owners Ask About Expanding Near King’s Landing?
Should I lease more space now, before the hotel is built?
Only if the numbers work without the hotel. Negotiate when rent starts and keep room to expand nearby, so you aren’t paying for seats you can’t fill yet.
How do I know when to add staff?
Count customers by hour every week. When the same hours stay full for a month, add a shift for those hours first.
What should I do while the hotel developer looks for money?
Build regulars among the people already living downtown, and keep a written plan for an on-time opening and a late one.
I want to open a business downtown. Is now a good time?
It can be, if your first-year plan works on today’s foot traffic. Treat the hotel crowd as a bonus, not the base.
Does Dr. Paul meet with Fort Pierce owners?
Fort Pierce is about two hours from Dr. Paul’s Central Florida office. Phone and Zoom handle most planning sessions, and Dr. Paul can come to downtown Fort Pierce when it helps.
Just south, Port St. Lucie owners wrestle with something else entirely: doing every job themselves. Read the Port St. Lucie business consultant page.
Waiting on a downtown project of your own? Temple Terrace owners are building customer lists before theirs opens; read the Temple Terrace business consultant page.
Can a Business Consultant Help Me Plan Around a Delayed Project?
Fort Pierce owners know their trade. The hard part is the business side: deciding how much to spend on a crowd that has no arrival date. That is the work Dr. Paul does in strategic planning consulting. On a free 15-minute call, he looks at your monthly costs with you, and you leave knowing how long you can wait and what your first step should be. Still shopping for a downtown space? Bring the rent quote.
Or call or text (321) 948-9588.
Sources
- WPTV, Fort Pierce breaks ground on King’s Landing project after years of delays, April 10, 2025.
- CBS12, King’s Landing developer says it’s $15 million short, asks Fort Pierce for six more months, August 5, 2026.