How Do I Run Two Roofing Crews at Once?
Two roofs torn off by 9 a.m. One crew is short a bundle of ridge cap. The other found rotten decking and is waiting for you to decide. Rain is in the forecast for 3 p.m. and you are on the highway between them. Most roofing owners run a second crew by driving between roofs all day, and the second crew is always waiting on something. Business consultant Dr. Paul Borosky, DBA, MBA, helps roofers run two crews from a plan made the day before: materials dropped and counted, one lead per roof with a dry-in rule, and photos instead of drive-bys.
Call or text (321) 948-9588. Your first 15-minute call is free.
Last Updated: November 2026
Doctor Owl in Plain English
How Do I Run Two Roofing Crews Without Being on Both Roofs?
Plan both roofs the afternoon before. Drop and count materials the day before tear-off, with spare ridge cap, drip edge and decking. Give each crew one lead with a written checklist from tear-off to dry-in, and a rule: never tear off more than you can dry in by the weather call. Have each lead send photos at set points: tear-off done, decking checked, dry-in, final. Set a decking allowance each lead can approve alone. Visit each roof once, on purpose.
How This Guide WorksThis guide covers the roofing labor market, a two-crew day plan, the lead’s checklist, three steps and a Fabled Forest story where a badger roofer spends a rainy morning driving between two open roofs. More stories like the badger’s are in Dr. Paul’s Fabled Forest Business School Series.
The Market
Why Is a Second Roofing Crew Harder to Run Now?
Because the work is tighter on both ends. Of the roughly 166,900 roofers in the U.S., about one in five works for himself, and most of the rest work for roofing contractors, per the Bureau of Labor Statistics. With so many roofers running their own trucks, experienced leads are hard to hire, so your second crew is often led by someone new to running a roof.
Demand is softer too. U.S. asphalt shingle shipments fell 9.9% in the first quarter of 2026, to 38.1 million squares, as material costs climbed, according to Roofing Contractor. With thinner margins, a crew waiting on a decision is money you do not get back. Heat rules matter for every crew on a roof; see the heat safety rules trend guide.
A Sample
What Does a Two-Crew Day Plan Look Like?
| When | Crew A | Crew B |
|---|---|---|
| Day before, 3 p.m. | Materials dropped and counted | Materials dropped and counted |
| Day before, 5 p.m. | Owner checks the forecast; leads get the weather call time | |
| 7 a.m. | Tear-off starts on the south face | Tear-off starts on the garage |
| 10 a.m. | Photo: tear-off done, decking checked | Photo: decking replaced, 6 sheets |
| Weather call | Dry-in done | Dry-in done |
| Owner visit | 11 a.m. | 1 p.m. |
What to Do
How Do I Set Up Two Crews to Run Without Me?
Running two crews takes three stages, laid out in Dr. Paul’s Organize-Plan-Grow™ Strategy.
List every call you got from a crew in the last two weeks and why: missing material, decking, weather, customer questions. Write the tear-off to dry-in checklist.
Set the day-before routine: material drop and count, weather check, a decking allowance for each lead, the photo points. Name one lead per crew.
Run both crews from the plan for a month. Visit each roof once a day at a set time. Add to the checklist every time a crew has to call you.
Not open yet? Plan the lead role and the day-before routine before you add the second crew. The roofing contractor business plan template has an operations section for it.
Crew lead? Send the photos at every check point, even when nobody asks. A lead the owner never has to call gets the second crew.
Dr. Paul’s Take
Run the Roof From the Day Before
Owners think the second crew needs them on site. Dr. Paul finds the second crew needs the owner’s decisions made before the day starts. Materials counted on the ground, a decking allowance the lead can use and a dry-in rule tied to the forecast take most of the calls off your phone. Then photos tell you what a drive-by used to. Building that day-before plan with you is the work in Dr. Paul’s business operations consulting.
Common Mistakes
What Goes Wrong When a Roofer Adds a Second Crew?
Materials ordered, not counted. The crew finds out at 10 a.m. that the ridge cap is short. Count it on the ground the day before.
Tearing off the whole roof at once. Tear off only what you can dry in by the weather call.
No decking allowance. Every soft sheet becomes a phone call. Give the lead a number of sheets and ask for photos.
Checking in by driving over. Ask for photos at tear-off, decking, dry-in and final, and visit once on purpose.
Doctor Owl Teaches
Why Did the Badger Spend His Morning on the Highway?
Doctor Owl was directing two of the neighbor’s boys, one at each end of the Lone Oak, as they cleared the gutters, when the badger roofer pulled up in his truck, wipers going.
“Two roofs open,” the badger said. “One crew is short ridge cap. The other found soft decking and wants me to look. Rain by three.”
“Where are you going first?”
“Both. That is the problem.”
Doctor Owl looked at his two gutter boys. Each had a list on a card: which gutter, which bag, when to come down if it rained.
“What would your leads need to know,” asked Doctor Owl, “so they never have to call you?”
That night the badger wrote it out. Materials dropped the day before and counted on the ground, with spare ridge cap and drip edge. A decking allowance each lead could use without calling: up to eight sheets. A rule: tear off only what you can dry in before the weather call. And photos sent at four points: tear-off done, decking checked, dry-in, final.
The next week, the second crew hit soft decking. The lead replaced six sheets, sent the photo and kept going. The first crew watched the clouds and dried in early.
The badger visited each roof once, at the time he had planned. He spent the rest of the day bidding the next two jobs.
Doctor Owl’s gutter boys finished before the rain. Neither had come down to ask him anything.
The lesson: two crews run without you when the decisions are made the day before and written down for each lead.
The badger and his crews are from the Fabled Forest. Two open roofs and a rain cloud are from real life.
What Else Do Roofers Ask About Running Two Crews?
How big a decking allowance should a lead have?
Enough for the decking your roofs usually need, with photos as proof. Many owners start with a set number of sheets per job and raise it as the lead proves out.
Should the lead also be the best installer?
Not always. The best lead plans the day, watches the weather and talks to the homeowner. Speed on the roof is the smaller part of the job.
Can I use the checklist with a sub crew?
Yes, as deliverables in the subcontract: materials counted, dry-in by the weather call, photos at set points. Spell out results, not how they work, and keep their own lead in charge of the crew.
What if the homeowner wants to talk to the owner?
Introduce the lead at the contract signing as the person in charge of their roof. Call the homeowner once yourself, at dry-in.
I’m starting a roofing company. When do I add the second crew?
When you have a lead who can run a roof from your checklist and enough signed work to keep both crews busy for a season.
This is one of six guides for roofing and remodeling owners. See them all on the Roofing and Remodeling page.
A Texas owner gave every job one owner and one date: see the Fort Worth business consultant page.
Two crews means two leads you can trust. Start with finding roofing crew leads who stay.
Ready to Get Off the Highway Between Roofs?
Two crews can run without you driving between them. Dr. Paul builds the day-before plan and the lead checklists with roofers in business operations consulting. Bring two weeks of crew calls to a free 15-minute call. Rates are on the pricing page.
Bring Your Crew Calls to a Free Call
Or call or text (321) 948-9588.