How Do I Plan a Fort Smith Expansion Without It Stalling My Business?

Dr. Paul Borosky, DBA, MBA, Business Consultant
Dr. Paul Borosky, DBA, MBABusiness Consultant

A second location. A bigger kitchen. The building next door. Fort Smith owners are ready to grow, and many of them say the same thing happens next: the remodel drags, the rent starts anyway and the cash runs thin before the doors open. Dr. Paul Borosky, DBA, MBA, is a business consultant and business plan writer. He works with Fort Smith owners on site or by Zoom to lay out the expansion before the first permit application goes in, so a slow approval costs weeks, not the business.

Stage 2 of 3: Plan

Plan the expansion in phases, assume the permit and inspection steps will take longer than the contractor says, and keep enough cash to carry both locations through the delay. Laying out those phases is Plan, the second stage of Dr. Paul’s Organize-Plan-Grow™ Strategy. What a business consultant brings is the timeline, the budget and the buffer, written down before you sign a lease.

Call or text (321) 948-9588. Your first 15-minute call is free.

Last Updated: November 2026

Doctor Owl in Plain English

Why Do Remodels Take Longer Than Planned?

Because the plan usually covers the construction and skips the approvals. Design review, permits, inspections and change orders each add time, and each one can push the opening date while rent and payroll keep running.

Ruben the Rhino is a character in Dr. Paul’s Fabled Forest Business School books. Building delays into an expansion plan works in any city.

Real World Help From Dr. Paul

Great at Your Trade. Stuck Waiting on the Build-Out?

Help for Fort Smith owners planning a second location or a remodel.

Best fit for this page

Business Consulting

Lay out the phases, the budget and the cash buffer before you commit.

See strategic planning consulting

Business Plan Writing

Funding the expansion? Dr. Paul is a business plan writer who shows the bank a timeline it can trust.

See business plan pricing

Business Plan Template

Each template has a growth section and a financial model for a new location.

Browse the templates

Small Business Education

The free lessons explain strategic planning in plain English.

Read the free lessons

What Owners Are Saying

Fort Smith Owners Say Permits Slow Their Remodels. How to Build Delays Into the Plan

On March 5, 2026, nine small business owners met at the Fort Smith Public Library for a roundtable hosted by city director Christina Catsavis. The meeting turned into a list of frustrations about working with the city to expand, especially when the expansion involved renovating a building, Talk Business & Politics reported. One example in the story: Harvest Moon Bakery was considering renovating a building at 505 Rogers Ave. downtown as a second location.

A city official at the meeting said staff try to be open minded and respectful while keeping the focus on safety. Catsavis said she would push for a small business liaison at the city. Whatever comes of that, owners planning a remodel this year are working with the process as it is today.

That process is not unique to Fort Smith. Older buildings bring surprises. Codes that did not apply to the last tenant apply to you. A change of use, from retail to food service for example, can trigger new safety, plumbing and accessibility rules. Each review round can take weeks.

Here is where owners get hurt. The plan assumes the space opens in four months. The lease starts on signing. The contractor is booked for a set window. Then a review comes back with comments, the drawings go back out and the opening slips to month seven. Now the owner is paying rent on an empty space, holding staff they hired too early and covering both locations from one location’s sales.

Strong businesses weaken this way more often than most owners think. The original shop was healthy. The expansion idea was good. The plan just had no room for delay, and the cash ran out in the gap.

Lenders feel it too. A bank that approved a loan for a four-month build-out may not be eager to extend it when the project runs to seven. Suppliers who were promised a big opening order wait. Staff hired early start looking for steadier work. One slow approval can ripple through every relationship the expansion depends on.

The answer is not to skip the expansion. It is to plan it the way it will actually go.

Dr. Paul Borosky, DBA, MBA, Business Consultant

Dr. Paul’s Insight

Ask for Free Rent Until You Can Open

Many landlords will agree to a rent-free build-out period, or to start rent at certificate of occupancy instead of at signing. Dr. Paul tells owners to ask before they sign, when they still have leverage.

Plan the Build in Phases

How Do You Plan an Expansion That Survives Delays?

Break the project into three phases and give each one its own budget and its own cushion.

Phase 1: Before You Sign

Get the space checked by an architect or contractor who knows local code. Ask the city what reviews the change will need. Price the remodel and add 20% for surprises.

Phase 2: Approvals and Build

Expect review comments and plan one resubmittal. Hire staff for the new site only when inspections are scheduled, not when the lease is signed.

Phase 3: Opening

Budget for three slow months while the new location builds its customer base. Keep the original location’s cash separate so it stays healthy.

Before You Apply for a Permit

  1. Ask the city for a pre-application meeting and bring rough drawings. Write down every requirement they mention.
  2. Confirm whether your use is changing. If it is, ask which codes that triggers.
  3. Negotiate rent to start at opening or after a set build-out period.
  4. Build a month-by-month cash plan that shows both locations, with the opening date pushed back three months.
  5. Line up financing for the worst case, not the contractor’s best case.
  6. Pick one person to own the permit process and check its status every week.

The math on a delay: if a new space costs $6,000 a month in rent, utilities and early payroll before it opens, a three-month delay costs $18,000. Planned for, that is a line in the budget. Unplanned, it comes straight out of the original business. Add a second three-month delay to the plan and see if the business still survives it. If it does, you are ready to sign.

One more habit helps: keep a simple log of every conversation with the city, the contractor and the landlord, with dates and what was promised. When a question comes up three months later, the answer is on paper, not in someone’s memory.

A business consultant earns the fee on projects like this. Through strategic planning consulting, Dr. Paul lays out the phases, the timeline with a delay built in, the cash plan for both sites and the questions to ask the landlord before you sign.

How to Use a Strategic Plan Template

Watch Dr. Paul

How to Use a Strategic Plan Template

An expansion plan starts as a strategic plan. Dr. Paul walks through the template he uses.

Before You Sign for the New Space

  • A code check on the building
  • A list of required city reviews
  • Rent tied to opening, in writing
  • A cash plan with a three-month delay built in
  • Financing sized for the worst case

Local Help for Fort Smith Owners

Fort Smith Help

  • City of Fort Smith Planning and Building Safety: ask about a pre-application meeting before you submit plans.
  • Main Street Fort Smith: support for downtown owners and building projects.
  • Arkansas Small Business and Technology Development Center: free advising, including a center at UA Fort Smith.

These groups are independent of Dr. Paul.

Ways to Work With Dr. Paul

Want the Expansion Plan Built With You?

Dr. Paul can walk the new space with you in Fort Smith, traveling from Central Florida for an on-site visit of two days or more, with travel paid by the client. The weekly check-ins while permits move can happen by Zoom. See how on-site visits work.

More Arkansas Questions

Owners in other Arkansas cities ask different questions.

Fort Smith in the News

Should Fewer Fort Smith Flights Slow Your Expansion?

Updated November 27, 2026

Not by itself, but it should shape the plan. Talk Business & Politics reports the Fort Smith airport had 49,992 enplanements from January through October. The total fell 5.1% from 52,684 a year earlier. The airport is on pace to drop below 60,000 for the year, the first time since 2021.

The worry: American Airlines now runs about three daily flights to DFW, down from four or five in 2021. Fewer flights mean fewer choices for business trips.

The hope: October came in at 5,356 enplanements, down only 2.4%. Airport director Andrew Meyer said American restored more flight frequency that month. The airport also works with Mead & Hunt to recruit a new route. In October 2022, it won a $1.145 million FAA grant to chase a Chicago or northeastern route.

Dr. Paul’s Take

Build two versions of your plan. One assumes travel stays tight. One assumes a new route arrives. If growth depends on out-of-town clients, test how a drive to a bigger airport changes the cost. Dr. Paul, a business consultant who travels to Fort Smith, helps owners plan growth in steps, so a slow quarter does not stall the whole push. The place to begin is his strategic planning consulting.

Stepping Out of the Real World and Into the Fabled Forest

This next part steps into the Fabled Forest, the invented world from Dr. Paul’s books, where animals run real kinds of businesses. The rhino and his repair shop are made up. Planning an expansion that survives delays is a real Fort Smith task. Read more in Dr. Paul’s Fabled Forest Business School books.

Doctor Owl Teaches

Could Ruben Open His Fourth Bay Before Winter?

The Bay Behind the Barn

Doctor Owl was sharpening the pruning shears on a whetstone by the back step when Ruben the Rhino thundered up the path.

“I am adding a fourth bay,” Ruben said. “The barn behind the shop. Open by first frost.”

“Who approves a new bay in the forest?”

“The beaver council. They check the walls and the drains.”

“And how long do the beavers take?”

Ruben paused. “Last time? Two moons. Then they sent it back. Push it in, we’ll find it.”

“Then plan for four moons, not one. And do not pay the new mechanic until the beavers say yes.”

Ruben grumbled, but he wrote the plan. The beavers did send it back once. The fourth bay opened a month after frost, and the shop never missed a payday.

The lesson: the expansion that plans for delay is the one that survives it. Building that plan is part of strategic planning consulting.

You Built a Business Worth Expanding. Let’s Plan the Build.

Most owners Dr. Paul helps know their trade inside out and have never managed a construction timeline. That part he can carry. Book a free 15-minute call and talk through the space you are looking at.

Book a Free 15-Minute Call

Or call or text (321) 948-9588. Or see how a business consultant can help.

Fort Smith Owners Ask About Expanding

How much cushion should a remodel budget have?

Many owners plan 15% to 20% above the quote for surprises in older buildings.

When should I hire staff for a new location?

When inspections are scheduled, not when the lease is signed.

Can Dr. Paul write a plan for an expansion loan?

Yes. As a business plan writer, he shows the lender the timeline, the cost and the cash plan for both locations.

What if the city sends my plans back?

Plan for one resubmittal from the start, so it does not break the schedule.

Is the first call free?

Yes, the first 15 minutes. The pricing page covers longer work.

Sources

Dr. Paul Borosky, DBA, MBA, Business Consultant and author

About the Author

Over 1,000 small business clients in all 50 states and Canada have worked with Dr. Paul Borosky, DBA, MBA, a business consultant, business plan writer and author of the Fabled Forest Business School Series. He earned a DBA from National University and an MBA in Finance from Webster University. Expansion plans, from a second shop to a bigger building, are some of his favorite projects. About Dr. Paul or his books on Amazon.