Dr. Paul Borosky, Business Consultant
Dr. Paul Borosky
Business Consultant

How Do Contractors Get Through a Home Building Slowdown?

Your biggest builder client used to send you three houses a month. Now it’s one, and they’re asking for a better price.

When home building slows, subcontractors and small builders feel it first. This page shows a residential contractor how to plan for a slower 2027 without panicking.

Dr. Paul Borosky, Business Consultant, has helped 1,000+ owners plan for the slow year before it arrives.

Talk to Dr. Paul

Call or text (321) 948-9588.

Last Updated: November 2026

From Dr. Paul’s Fabled Forest Business School Strategy, Book 6 of Dr. Paul's Fabled Forest Business School
Strategy
Book 6
Why this book: a slowdown is when strategy pays off.
See It on Amazon

Real World Help From Dr. Paul

Construction Business Plan Template

A plan and a profit model built for contractors.

See the construction template

Strategic Planning Consulting

Plan for a slower year with Dr. Paul.

See planning help

Business Plan Writing

Lender wants a plan? Dr. Paul writes it.

See plan writing

Small Business Education

How to manage subcontractors.

Read the subcontractor lesson
Doctor Owl in Plain English: New home building is slowing, and the nation’s home builders see more weakness ahead in 2027. If most of your work comes from builders, add other kinds of work now, plan your costs for a slow year, and don’t cut your price below what the job costs.

How This Guide Works

In a hurry? Doctor Owl’s answer and the 3-step box will do. Want the story? In Dr. Paul’s Fabled Forest Business School Series, Bella’s framing work for a big home builder drops by half in one season, and the builder asks her to cut her price. The example comes after the trend.

This month, do these 3 things.
  1. Add up what share of last year’s revenue came from new home builders.
  2. Write down your monthly costs if work dropped by a third.
  3. List two kinds of work your crew could do besides new homes.

What Did Bella Do When the Builder Slowed Down?

The beaver lodge development kept Bella’s framing crew busy for two years. Then the developer slowed to half the homes and asked Bella for a lower price.

Doctor Owl asked, “Is this a fire, or a foundation?” The price cut request was a fire. Depending on one builder was the foundation problem. They used Dr. Paul’s Organize-Plan-Grow™ Strategy.

  1. Organize. Chuck ran the numbers. At the lower price, the framing jobs barely covered labor and lumber. More than half the company’s revenue came from that one developer.
  2. Plan. Bella kept the developer at a price that still made money, even if it meant fewer homes. She started bidding remodels and small commercial jobs.
  3. Grow. Each quarter, Chuck reports what share of revenue came from new homes. The goal is under half by next year.

The developer came back to her price when a cheaper framer missed deadlines.

What’s Happening to Home Building?

The National Association of Home Builders reported in October 2026 that 2026 will be the second year in a row with a decline in single-family home building, and signs point to further declines in 2027.

NAHB also noted that multifamily starts fell 21.7% in August 2026. Rising long-term interest rates are a big part of the story, since buyers and developers both depend on borrowing.

Housing Starts, Change in August 2026
Single-family starts+7.6% for the month
Multifamily starts-21.7% for the month

One month of data. Source: National Association of Home Builders (October 2026).

Why Does a Slowdown Squeeze Subs First?

If you build, frame, roof, or finish new homes, fewer starts means fewer jobs, and more pressure on price from the builders who are still building.

Cutting your price to keep volume can feel safe. If the price no longer covers the job, it just loses money faster.

How Do You Plan for a Home Building Slowdown?

  1. Know your exposure. What share of your revenue comes from new homes?
  2. Plan a slow-year budget. What happens if work drops by a third?
  3. Hold a floor on price. Know what each job costs you. Don’t go below it.
  4. Add nearby work. Remodels, repairs, and light commercial use the same skills.
  5. Stay close to your best builders. Reliable subs keep work when builders cut back.

What Happens When You Cut Price to Keep Volume?

Illustration only. Round numbers, not a real company.

Say a framing job used to earn you a small profit, and the builder asks for a 10% cut. If your margin was thinner than that, every house now loses money. Keeping fewer houses at a fair price can leave you with more in the bank.

Working with subs of your own? The QBP lesson on managing subcontractors helps. Want to price jobs from real costs? Read how to calculate your overhead rate. Plan a slow year in the construction business plan template.

Want Help Planning for a Slower Year?

Bring last year’s revenue by client to a free 15-minute call with Dr. Paul. You leave knowing your exposure and your first move, and what more help would cost if you want it.

Book a Free 15-Minute Call

Or call or text (321) 948-9588.

What Do Residential Contractors Ask About a Slowdown?

Will home building pick up in 2027?

Home builders see more weakness ahead, tied to high rates. Plan for slow and treat a pickup as a bonus.

Should I lower my price to keep a builder?

Only if the new price still covers your costs. Otherwise you lose money on every job.

Is multifamily safer than single-family?

Not right now. Multifamily starts have fallen sharply too.

Dr. Paul Borosky

About the Author

Dr. Paul Borosky, DBA, MBA, helps contractors plan for the slow year before it arrives. He works with clients in all 50 states and Canada.

Sources

Scroll to Top