How Do Remodelers Handle Change Orders Without Losing Money?
“While you’re here, can you also move that outlet?” You say yes, because it is small and the customer is nice. Then it is a bigger vanity, a different tile and two more recessed lights. None of it is written down. At the end of the job, the customer remembers the original price and you remember three days of extra work. Remodelers keep only a thin slice of each job as profit, so three small unbilled yeses can wipe it out. The answer business consultant Dr. Paul Borosky, DBA, MBA, gives remodelers: price changes on the spot from a price sheet, get them signed before the work and collect when the change is made.
Call or text (321) 948-9588. Your first 15-minute call is free.
Last Updated: November 2026
Doctor Owl in Plain English
How Do I Charge for Change Orders Without Upsetting the Customer?
Put the rule in the contract: any change to the work or price gets written, priced and signed before anyone builds it. Keep a price sheet for the common changes, such as an added outlet, rotted subfloor per square foot and upgraded tile per square foot, so you can price on the spot. Track every allowance for selections, and show the customer the running balance. Collect payment for each change when it is signed, not at the end.
How This Guide WorksThis guide covers what remodelers keep as profit, what an unbilled change costs, a sample change order price sheet, three steps and a story where a badger remodeler adds a porch light, a step and a railing for free. More stories like the badger’s are in Dr. Paul’s Fabled Forest Business School Series.
The Margin
How Much Profit Does a Remodeler Keep on a Job?
Not much. Remodelers averaged a 6.3% net profit margin in 2024, the highest since 1996, on a 29.9% gross margin, according to NAHB’s 2026 Remodelers’ Cost of Doing Business Study, as NAHB reported. The Journal of Light Construction suggests budgeting about 10% of a project for change orders, in its guide to change orders. When changes run that large and profit runs that thin, an unbilled change is not a favor. It is the job’s profit. See the remodeling slowdown trend guide for the market behind it.
An Example
What Do Three Unbilled Changes Cost a Remodeler?
| Bathroom remodel, sample | Amount |
|---|---|
| Contract price | $48,000 |
| Expected net profit at 6.3% | $3,024 |
| Added outlet and two recessed lights, your cost, unbilled | $900 |
| Larger vanity and new plumbing rough-in, your cost, unbilled | $1,500 |
| Rotted subfloor, 60 square feet, your cost, unbilled | $1,200 |
| Net profit left | $0, a loss of $576 |
Your Numbers
How Do I Build a Change Order Price Sheet?
Fill in each line from your last five jobs.
- Your ten most asked-for changes, each with your cost: $____ and price: $____.
- Rotted subfloor or framing, your price per square foot or linear foot: $____.
- Upgrades over the allowance: the difference plus ____% markup.
- A trip and rescheduling charge when a change brings a sub back: $____.
- Days added to the finish date for each kind of change: ____.
What to Do
How Do I Set Up a Change Order Process That Pays?
Pricing changes the right way takes three stages, which follow Dr. Paul’s Organize-Plan-Grow™ Strategy.
Pull your last five jobs and list every change, billed or not. Note which ones never got written up and what they cost you.
Add the signed-before-built clause to your contract. Build a price sheet for your ten most common changes. Set up an allowance tracker for selections.
Price changes on the spot from the sheet, get a signature on a phone or tablet and collect payment with the change. Extend the completion date on the same form when the change adds time.
Starting a remodeling company? Put the change order clause and an allowance tracker in your process from your first job. The home remodeling business plan template has an operations section for it.
Lead carpenter? When a customer asks for anything extra, say “Let me get you a price on that,” and call the office. Never say “no problem.”
Dr. Paul’s Take
A Yes Without a Price Is a Discount
Remodelers say yes to small changes to keep the customer happy. Dr. Paul shows them who pays for it: their own margin. A customer told the price on the spot, in writing, is rarely upset. A customer who gets a surprise bill at the end usually is. A price sheet for common changes turns the hard conversation into a 30-second one. Building that price sheet and the change process with you is the work in Dr. Paul’s sales and pricing strategy consulting.
Doctor Owl Teaches
How Much Did the Badger’s Free Porch Light Cost?
The carpenter wrote each change on Doctor Owl’s order as he made it: a bookshelf, then a drawer, then a door, each with a price beside it.
The badger remodeler was waiting behind him. “I should do that,” he muttered.
“Do what?”
“Write it down. I just finished the rabbits’ porch. They asked for a light by the door. Then a second step. Then a railing. I said yes every time.”
“And the bill?”
“The price we signed in spring. They were surprised I even asked about the rest.”
Doctor Owl paid for his drawer and his door. “What did the light, the step and the railing cost you?”
The badger added it up on the carpenter’s counter. Two days of work and the materials. More than the whole profit on the porch.
That week he wrote a page of prices for the changes customers asked for most: a light, a step, a railing, rotted boards by the foot. He added a line to his contract: nothing extra gets built until it is written, priced and signed.
On the next job, the customer asked for a second window. The badger looked at his page, gave a price and held out the paper. The customer signed it on the spot and paid for it that afternoon.
Doctor Owl’s bookshelf came out exactly as ordered. So did the bill.
The lesson: every change gets a price and a signature before it gets built, or it comes out of your profit.
The badger is a Fabled Forest remodeler. The free porch light that ate the profit is not invented.
What Else Do Remodelers Ask About Change Orders?
I’m starting a remodeling company. What should my contract say about changes?
That any change to scope or price must be written, priced and signed by both of you before the work starts, and that it may change the completion date.
How does Dr. Paul help?
He builds your change order price sheet and allowance tracker with you, and reviews your contract language with your attorney in mind.
Should I charge for very small changes?
Price every change, even if you choose to waive one as a goodwill gesture. Writing “no charge” on the form shows the customer what they got.
What markup should a change order carry?
At least your normal markup, plus the cost of the disruption: re-scheduling subs, extra trips and the time to price it. Changes cost more to do than the same work planned from the start.
What if the customer will not sign?
For a requested change, it does not get built yet; keep working on the original scope. For hidden conditions like rot, your contract should allow a stop-work and a priced change. You cannot build the original scope on a rotted floor.
Roofing and remodeling owners have five more guides like this one on the Roofing and Remodeling page.
A Nevada owner watched costs outrun the budget too: see the Reno business consultant page.
Change orders are one place profit hides. Find the rest with simple job costing for roofers.
How Many Free Changes Did Your Last Job Give Away?
Every unwritten yes comes out of your margin. Dr. Paul builds change order price sheets and processes with remodelers in sales and pricing strategy consulting. Bring your last five jobs and their changes to a free 15-minute call. Rates are on the pricing page.
Bring Your Last Five Jobs to a Free Call
Or call or text (321) 948-9588.
Sources
- NAHB, Home Remodeling Profit Margin Jumps on Demand and Business Practices, April 2026.
- NAHB Remodelers, Minimizing Change Orders by Being Upfront.
- Journal of Light Construction, Handling Change Orders.