Home › Business Consultant › Florida › Deltona › Orange City

How Do I Keep My Business Running When the Water Rises?
Orange City is rebuilding the drainage around Mill Lake and Industrial Drive. Today the pump station there moves about 1.5 cubic feet of water per second. The new one could move up to 50. Construction is expected to start in early 2027, after bidding, and the $18.3 million budget doesn’t yet cover even the smallest option. Until then, the basin drains the way it does now. Meanwhile, Orlando Health is building a round-the-clock emergency room on Enterprise Road, due in 2027. Dr. Paul Borosky, DBA, MBA, a business consultant based nearby in West Volusia, helps owners put a storm-day plan on paper before the next heavy rain.
Call or text (321) 948-9588. Your first 15-minute call is free.
Last Updated: November 2026
Doctor Owl in Plain English
What Should a Small Business Do Before a Flood?
Decide now what happens on the bad day, and write it on one page. Who moves the stock and equipment off the floor? Who answers the phone if the shop is closed? Where is the job list kept if the computer gets wet? Give each task to one person by name. Then practice it once before storm season, so nobody is guessing when the water is already at the door.
How This Guide WorksThis guide covers Orange City’s stormwater project, a storm-day checklist, Dr. Paul’s view on why insurance is not a plan, and the new emergency room coming to Enterprise Road. In the Fabled Forest, Tobin the Toad learns his shop is lower than he thought. More stories like Tobin’s are in Dr. Paul’s Fabled Forest Business School Series.
The Problem
Why Is Orange City Rebuilding Its Stormwater System?
To move far more water out of the Mill Lake and Industrial Park basin. In October 2026, Public Works Director Ben Bartlett presented the finished design to the City Council. The plan pipes water from Mill Lake and Industrial Drive to a new pump station, then on to the city’s borrow pit along West French Avenue.
- TodayThe existing station pumps about 1.5 cubic feet of water per second.
- October 2026Design and permits done. The budget is $18.3 million, including $15.2 million from Volusia County’s Transform386 program.
- Early 2027Construction expected to start after bidding. A 25-cfs station is estimated at $19.37 million; the full 50-cfs station at $26.58 million.
Source: WFTV, October 30, 2026.
At full size, the new station would move more than 33 times as much water as the old one. The final size depends on bids, grants and funding. For a business near Mill Lake or on Industrial Drive, that means at least one more storm season on the old system.
Checklist
Is My Orange City Business Ready for a Flood Day?
Dr. Paul walks owners through it in the order of Dr. Paul’s Organize-Plan-Grow™ Strategy. Check each box before the next named storm.
Organize
- You know which of your stock, tools and records sit at floor level, and where they go when water is coming.
- Your customer list, job list and supplier phone numbers live somewhere other than the shop computer.
- You’ve asked your insurance agent, in writing, what the policy pays if you’re closed for a week.
Plan
- A one-page storm plan names who does each task, and every person has a copy.
- Calls forward to a cell phone, and someone owns answering them while the doors are shut.
Grow
- You know which services your customers need right after a storm, and you’re ready to offer them first.
- Your best customers know how to reach you if the shop is closed.
A missed call after a storm is a customer who calls the next name on the list. See the missed calls trend.
Running the crew or the front desk? Draft the storm page yourself and hand it to the owner. Most owners have never had one.
Doctor Owl Teaches
How Did Tobin the Toad Get His Shop Ready for the Big Rain?
Doctor Owl was buying an umbrella from the corner vendor as the first drops fell when Tobin the Toad hopped under the awning beside him.
“The council’s building a big new drain for the marsh,” Tobin said. “Next spring.”
“And this season?”
Tobin shrugged. “My shop’s tight as a toad’s seal.”
“Where do you keep your pipe fittings?”
“Bottom shelves. Heavy stuff goes low.”
“And who answers your calls if the shop is closed?”
Tobin opened his mouth, then shut it. He answered every call himself, from the shop counter. His lead tech had never seen the job list.
That night they wrote one page. Fittings move to the top shelves when the storm flag goes up. The job list gets copied to the lead tech every Friday. Calls forward to Tobin’s pocket phone, and the lead tech takes the morning ones.
Three weeks later, the rain came hard. Water crept an inch across the shop floor. The fittings, up on the top shelves, stayed dry. The calls came in, and Tobin’s crew was out the next morning clearing other critters’ flooded pipes while two plumbers across the marsh were still bailing out their own shops.
The lesson: the drain is the council’s job. The plan for your own shop is yours.
Illustration only: the marsh and the council drain are made up. Orange City’s stormwater project is real.
The Opportunity
What Will the New Orlando Health ER Bring to Orange City?
Steady traffic at all hours. In July 2026, Orlando Health began building a freestanding emergency room at 2695 Enterprise Road. The 11,600-square-foot building will have 10 exam rooms and is expected to be finished in 2027. Orlando Health says it will be open 24 hours a day, seven days a week.
A building that never closes brings staff on every shift, plus patients and families at every hour. That’s demand for early breakfast, late meals and quick errands on that stretch of Enterprise Road. A medical building that never closes also needs plumbing, HVAC and cleaning crews who pick up the phone at 2 a.m. Businesses that stay open when the storm passes are the ones those workers will remember.
Dr. Paul’s Take
Insurance Is Not a Storm Plan
Most owners carry insurance and call it a plan. Insurance pays for what broke, later. It doesn’t move the stock, answer the phone or tell the crew where to report. Dr. Paul’s view: a short written plan, made before the storm, is worth more than any policy on the morning after. Name each task, name the person, and practice it once. The owners who reopen first win the customers whose usual shop is still closed. Putting that page together, and the rest of how your shop runs, is what Dr. Paul does in business organization and SOPs work.
What Do Orange City Owners Ask About Flooding and Growth?
Is my business in the Mill Lake basin?
Ask Orange City Public Works. The project covers Mill Lake and the Industrial Drive area, and the city can tell you whether your address drains into it.
When will the new stormwater pump be built?
WFTV reported that construction is expected to start in early 2027, after bidding. The final size and cost depend on bids, grants and funding.
Does my insurance cover lost sales after a flood?
Ask your agent in writing before storm season. Flood damage, lost income and closures can sit under different policies with different limits.
When does the Orlando Health ER open?
Orlando Health expects the Enterprise Road emergency room to be finished in 2027. It will be open around the clock.
Does Dr. Paul meet with Orange City owners?
Yes. Orange City sits next to Deltona, close to Dr. Paul’s home base, so in-person meetings are easy. Phone and Zoom work too.
Next door in Deltona, owners face a different squeeze: every customer wants Saturday. Read the Deltona business consultant page.
Still rebuilding savings after the last storm? The Gulfport business consultant page covers a weekly cash cushion.
Can a Business Consultant Help Me Plan for a Storm Day?
Orange City owners are good at the work. The business side is the hard part: keeping the shop running on the day the water rises. That’s the work Dr. Paul does in business organization and SOPs. On a free 15-minute call, he walks through what your shop does on a storm day, and you leave knowing the first three steps to write down. Opening near the new ER? Bring the hours you plan to keep.
Or call or text (321) 948-9588.
Sources
- WFTV, New stormwater system will boost Orange City pumping capacity, October 30, 2026.
- Orlando Health, Orlando Health Begins Construction on New Freestanding Emergency Room in Orange City, July 20, 2026.
