How Do I Price Custom Welding and Fabrication Jobs?

A builder wants a custom stair stringer and rail package. You sketch it on the back of the drawing, guess 20 hours and add up the steel from memory. The job takes 34 hours, the drops go in the scrap bin and the powder coater charges more than last time. You still got paid. You just worked two weeks for almost nothing. Custom work will always have surprises, but a quote can plan for them. As a business consultant who has advised more than 1,000 small businesses, Dr. Paul Borosky, DBA, MBA, builds quote sheets with fabrication shop owners.

Call or text (321) 948-9588. Your first 15-minute call is free.

Last Updated: November 2026

Doctor Owl in Plain English

How Do I Price Custom Welding and Fabrication Jobs?

Build every quote from the same sheet: material from a takeoff plus a waste allowance, fabrication hours from similar past jobs, finish and outside services at today’s prices, consumables and a contingency for what nobody has built before. Price hours at a shop rate that covers wages, overhead and profit. Put a short expiration date on every quote, because steel prices move. Then compare quoted to actual hours on every custom job.

How This Guide WorksThis guide starts with Dr. Paul’s view, then a sample quote, a story where Silas the Salamander of Salamander Seam Works counts the reeds before he promises a basket, three steps, what to keep from every job and questions to ask before you quote. More stories like Silas’s are in Dr. Paul’s Fabled Forest Business School Series.

Dr. Paul Borosky, DBA, MBA, Business Consultant

Dr. Paul’s Take

Your Past Jobs Are Your Price Book

Owners quote custom work from memory and a feeling for the customer’s budget. Dr. Paul has them pull the last 20 jobs: what was quoted, what the hours really were and what material really went out the door. The gaps repeat, and once they are on paper, they can be priced. Building the quote sheet and the job history behind it is the work in Dr. Paul’s sales and pricing strategy consulting.

A Sample Quote

What Goes Into a Custom Fabrication Quote?

Steel is the line that moves fastest. U.S. mill prices for hot-rolled coil rose from $830 to $865 a short ton to $1,350 to $1,400 in a year, per Kallanish data reported by GMK Center. Tube, pipe and angle move with them, so get a fresh service center price for every takeoff.

Stair rail package, sampleHow to count itAmount
Steel1,200 pounds from the takeoff at $0.80$960
Waste and drops10%, from your past jobs$96
Fabrication22 hours, from similar jobs, at a $95 shop rate$2,090
Material markup15% on steel and waste$158
Prep and touch-up6 hours of grinding and cleanup$570
ConsumablesWire, gas, discs, blades$120
Outside servicesGalvanizing at today’s price, plus 15%$437
Contingency30% of fab hours for new details, from your records$627
QuoteGood for 14 days$5,058

Example only. Add shop drawings, delivery and install as their own lines when they apply. Use your own takeoff, past hours and shop rate.

Doctor Owl Teaches

Why Did Silas Count the Reeds?

The Basket That Ran Short

Doctor Owl was weighing a bundle of reeds before agreeing to weave the beavers a new basket. He always added a handful for the ones that split.

Silas the Salamander came in from the heat of his forge, calm as always but frowning. “The badgers wanted an iron gate with curls on top,” he said. “I told them a price in the moment. It took me twice the days, and half my iron went to curls that did not fit.”

“Had you made curls before?” Doctor Owl asked.

“Never like those.”

“And how did you set the price?”

“I thought about the last gate. A plain one.”

That evening, with the young newt holding the lamp, Silas went back through his slate of past jobs. Gates, rails, a cart frame. For each, he marked what he had promised and what it really took.

Plain work ran close. Anything new ran long, every time, by about a third. And the scraps were always more than he counted.

From then on, Silas priced every job from his slate. Iron, plus a pile for scraps. Days from the closest past job. Extra days for anything he had never made. And a note: this price is good for two weeks, while iron costs what it costs today.

In the library, the beavers’ basket came out exactly the size they asked for, with three reeds left over.

The lesson: price new work from what old work really took, and leave room for what you have never built.

Silas, the young newt and the badgers are from the Fabled Forest. The custom job that takes twice the hours is real.

What to Do

How Do I Build a Fabrication Quote Sheet?

Building the quote sheet takes three stages from Dr. Paul’s Organize-Plan-Grow™ Strategy.

1. Organize

Pull your last 20 custom jobs. Record quoted and actual hours, steel used, drops scrapped and outside service costs.

2. Plan

Set your shop rate from wages, overhead and profit. Write the quote sheet with waste, finish, consumables and contingency lines.

3. Grow

Quote every job on the sheet with a 14-day expiration. Log actual hours on each job and compare monthly.

Opening a shop? Set your shop rate before your first quote. The welding and fabrication business plan template has a pricing section to build from.

Your Price Book

What Should I Record From Every Job?

  • Quoted and actual hours, split into fit-up, welding and finish.
  • Steel ordered, steel used and drops scrapped.
  • Outside service costs: galvanizing, powder coat, machining.
  • What was new or changed mid-job.
  • Photos of the finished piece, for quoting the next one like it.

Questions to Ask

What Should I Ask Before I Quote a Custom Job?

“Are these drawings final?” If not, quote time and material or a range.

“Who supplies the finish, and to what spec?” Paint, powder and galvanizing change the price.

“When do you need it, and is it installed?” Rush work and site work cost more. Say so in the quote.

What Else Do Fabrication Owners Ask About Quoting?

How much waste should I add for steel?

Use your own drops and scrap from past jobs. It varies by stock length and shape; your records are better than any rule of thumb.

Should I quote by the hour or a set price?

Set prices win more custom work, but only when built from a takeoff and past hours. Use time and material when the drawings are not final.

What if the customer changes the drawing after I quote?

Write it into the quote: changes are priced in writing before the work changes.

How does Dr. Paul help?

He builds your shop rate and quote sheet from your own job records and checks quoted against actual hours with you.

This is one of six guides for welding and fabrication shop owners. See them all on the Welding and Fabrication page.

Tired of competing on price alone? See the Grand Rapids business consultant page.

A new machine and slow-paying contractors pull on the same cash; see how a fabrication shop handles retainage.

Which Job Lost You the Most Last Year?

Bring the quote and the real hours to a free 15-minute call. Dr. Paul builds quote sheets for fabrication shops in sales and pricing strategy consulting. His rates are on the pricing page.

Build Your Quote Sheet

Or call or text (321) 948-9588.

Dr. Paul Borosky, DBA, MBA, Business Consultant and author

About the Author

Dr. Paul Borosky, DBA, MBA, has advised more than 1,000 small businesses in all 50 states and Canada. He holds a DBA from National University and an MBA in Finance from Webster University and wrote Dr. Paul’s Fabled Forest Business School Series. Meet Dr. Paul or browse his books on Amazon.

Sources

Scroll to Top