Home › Business Consultant › Florida › Kissimmee
How Much Will It Cost to Build Out My Space?

A former downtown Kissimmee bank is becoming a 3,020-square-foot restaurant for $760,000, and the city grant arrives only after the work is done. Owners eyeing older buildings know their craft cold. Walls, wiring and permits are new ground. Walking the space with Dr. Paul Borosky, DBA, MBA, a business consultant, turns those unknowns into a budget.
Finding the build-out cost comes down to getting written quotes for each trade, adding permits, design and equipment, then putting 15% on top for surprises. File it under Grow in Dr. Paul’s Organize-Plan-Grow™ Strategy, where a steady business adds space. The total decides whether the move pays. A small business consultant helps you build the budget before you sign the lease.
Call or text (321) 948-9588. Your first 15-minute call is free.
Last Updated: November 2026
Doctor Owl in Plain English
Why Do Build-Outs Cost More Than Owners Expect?
Because the quote for the work is only part of it. You also pay for drawings, permits, inspections, equipment, signs and the months with rent but no sales. Older buildings add surprises behind the walls. Ask each trade for a written quote, add the rest, and keep 15% extra for what nobody sees until the walls open.
Doctor Owl lives in Dr. Paul’s Fabled Forest Business School books. The cost layers he lists are what real contractors and lenders expect.
Real World Help From Dr. Paul
Ready to Grow, Not Sure What the Space Will Cost?
Support for owners pricing a new or bigger space.
Business Consulting
Build a full build-out budget, trade by trade, and test whether the new space pays.
See business growth consultingBusiness Plan Writing
Want it all in a plan a lender can read? Dr. Paul is a business plan writer as well.
See business plan pricingBusiness Plan Template
A business plan template’s Excel model shows how build-out debt changes three years of profit.
Browse the templatesSmall Business Education
A free lesson on planning a business expansion is a good first step.
Read the free lessonsThe Problem
What Does a Downtown Kissimmee Build-Out Really Cost?
The city just showed one real number. In July 2026, Spectrum News 13 reported that the Kissimmee City Commission approved $76,000 in grant funding to turn a former bank at 30 Broadway Ave. into a Brazilian restaurant. The owner said he had wanted a downtown home for years.
City documents put the whole project at $760,000. That pays for a 3,020-square-foot restaurant and updated mechanical, electrical, plumbing, HVAC and life-safety systems. Divide it out and the cost is about $250 per square foot.
The grant comes from the Downtown Kissimmee CRA’s Pioneer Project Incentive Program. It covers up to 10% of tangible project cost. Soft costs like architecture, engineering, legal fees and furniture do not count. An award up to $150,000 is paid in one payment. For this project, the grant is paid only after the certificate of occupancy and proof of payment.
So the owner pays the full build-out first and gets 10% back at the end. The other 90% comes from savings, a loan or investors.
That is where owners get hurt. They price the space by the rent and the contractor’s first number. Then the old wiring needs replacing. The hood needs a new duct. The permit takes two extra months. The budget doubles, and the business opens short of cash.
Older downtown buildings make this harder. A former bank was built for tellers and a vault, not a kitchen. Grease lines, hood exhaust, restrooms for a dining room and modern safety systems all have to be added. Each one brings its own permit and inspection. The project at 30 Broadway lists new mechanical, electrical, plumbing, HVAC and life-safety systems for exactly that reason.
A build-out that runs over does not just cost more. It eats the money meant for staff, inventory and the slow first months.
The Answer
How Do You Build a Build-Out Budget?
Stack the costs in layers.
Layer one: the construction
Get written quotes from each trade: framing, electrical, plumbing, HVAC, flooring, painting. In an older building, ask each one what they expect behind the walls. A contractor who says “nothing” has not looked.
Layer two: what you pay before the work
Design drawings, engineering, permits and impact fees. These are soft costs, and grants like Kissimmee’s do not pay for them. Budget them in cash.
Layer three: what goes inside
Equipment, furniture, signs, the point-of-sale system, the first inventory. Price each item. Used equipment can save a third, but add a repair line.
Layer four: the dark months
Count the months from lease signing to opening day. Multiply by rent, utilities and any staff you pay to train. Three to six months is common for a restaurant in an older building.
Layer five: the cushion
Add 15% of layers one and two for surprises. In a historic building, 20%.
Line up the money
List where each dollar comes from: savings, a bank loan, an equipment lease, a partner, the landlord’s allowance. Mark when each one arrives. A grant paid at the end needs bridge money to cover it until then. Ask the lender for a letter of intent early, because programs like Kissimmee’s want one with the application.
Then ask if it pays
Add the layers. Subtract any grant, and remember it may arrive at the end. Divide what is left by the extra monthly profit the new space will earn. That is how many months it takes to earn the build-out back. Under three years is strong. Over five deserves a hard second look.
Example: $400,000 in total cost, a $40,000 grant at the end, $360,000 net. The new space adds $9,000 a month in profit. Payback is 40 months.
If payback runs long, look for ways to shrink layer one. Use more of what the building already has, phase the work, or open part of the space first.
Manager pricing it for the owner? Start with layers three and four. You know the equipment and the staffing better than anyone.
How Business Growth Consulting Prices the Move
Business growth consulting builds the five-layer budget with the owner, checks the contractor quotes for gaps and runs the payback math. Dr. Paul also maps the cash timing, so the owner knows how much money is needed before the grant or the first sale arrives.
Dr. Paul’s Insight
The Grant Arrives Last; the Bills Arrive First
Owners treat a grant as a discount. In practice, Dr. Paul treats it as a reimbursement, because that is how programs like Kissimmee’s pay. The money comes after the work is done, inspected and paid for. An owner who counts the grant in the opening budget runs out of cash halfway through construction. Plan to pay all of it, then celebrate the check.
Which Quotes Should You Collect This Month?
- Three trade quotes. Written, for the same scope.
- A permit call. Ask what the space needs and how long it takes.
- An equipment list. Priced new and used.
- Your dark months. From signing to opening, with the monthly cost.
Restaurants and salons face the costliest build-outs. Compare the trends for restaurants and salons.
Local Help for Kissimmee Owners
Who Runs the Downtown Incentive?
- Downtown Kissimmee CRA, Pioneer Project Incentive Program: rules, documents and the online application.
- Florida SBDC Network: free help reviewing a build-out budget and loan request.
Neither office is tied to Dr. Paul.
Ways to Work With Dr. Paul When the work calls for it, Dr. Paul travels to Kissimmee and sits down with you on site; he also serves as a business plan writer when funding is part of the next step.
Want the Budget Built While You Walk the Space?
From his Central Florida base, Dr. Paul travels to Kissimmee for on-site work. Visits run a minimum of three days, with travel costs covered by the client. Bid reviews during construction can happen by Zoom. More about on-site visits.
Stepping Out of the Real World and Into the Fabled Forest
Now the page steps into the Fabled Forest, the invented world of Dr. Paul’s books. The platypus and her laundry are make-believe. The surprise inside an old building is not. Find more stories in Dr. Paul’s Fabled Forest Business School Series.
Doctor Owl Teaches
What Did Pearl Find Behind the Old Mill Walls?
Pearl the Platypus marched in, quarters jingling on her cord. Doctor Owl looked up from sorting seeds into paper packets.
“I am opening a second laundry in the old mill,” she said, counting on her bill. “The beaver says forty acorns to fit it out. I have fifty. Every load counts.”
“What is behind the mill walls?” asked Doctor Owl.
Pearl stopped counting. She did not know.
So she asked the beaver to open one wall. The water pipes were older than her grandmother. The mill needed new ones, and the Forest Council needed to see drawings first.
Doctor Owl helped her stack it up. Forty acorns for the work. Eight for the drawings and the Council. Twelve for the washers. Six for the moons with rent and no wash. Ten more for whatever the next wall held.
Seventy-six acorns. Pearl had fifty.
She did not give up. She opened half the mill first, with six washers instead of twelve, and saved for the rest.
The next wall held a bird’s nest and nothing else. Pearl kept the ten acorns and called it luck she had planned for.
The lesson: a build-out is more than the contractor’s quote. Stack construction, soft costs, equipment, dark months and a cushion, then check the payback. Read how Dr. Paul plans an expansion.
Looking at a Bigger Space?
Most of Dr. Paul’s clients here are Kissimmee owners who have outgrown their space and never priced a build-out. Bring the address and any quotes to a free 15-minute call. Leave with the five layers of your budget.
Or call or text (321) 948-9588. See business growth consulting.
Kissimmee sits in the middle of Florida’s vacation rental market. Cleaning owners there should read how to price and win vacation rental turnovers.
Build-Out Costs: Kissimmee Owner Questions
How much does a build-out cost per square foot?
It depends on the use and the building. The 30 Broadway restaurant works out near $250 per square foot in full.
Does the downtown grant pay up front?
No. The program reimburses part of the tangible cost, paid after the work is complete.
Can Dr. Paul write the plan a lender wants?
Yes. That is his other role, business plan writer.
Who pays for the build-out, me or the landlord?
It depends on the lease. Ask for a build-out allowance before you sign.
I plan on opening my first shop. Should I build out or find a finished space?
Compare both. A finished space can save months of rent with no sales.
Does the first call cost anything?
A 15-minute first call is free. Project rates are listed on the pricing page.
Sources
- Spectrum News 13, Kissimmee approves grant funding for former bank to become new Brazilian restaurant, July 8, 2026.
- City of Kissimmee, Pioneer Project Incentive Program (PPIP).
- Around Osceola, Grant to restore historic downtown building into restaurant, July 2026.
About the Author
A Central Florida business consultant, Dr. Paul Borosky, DBA, MBA, has worked with more than 1,000 small business owners in all 50 states and Canada. He is also a business plan writer and the author of the Fabled Forest Business School Series. His degrees are an MBA in Finance from Webster University and a DBA from National University. About Dr. Paul or his books on Amazon.
