Dr. Paul Borosky, Business Consultant
Dr. Paul Borosky
Business Consultant

What Is the Construction Industry Outlook for 2027?

Data center crews are booked solid. Office and retail crews are bidding against six other contractors for half the work.

That’s the construction picture heading into 2027, in two sentences. The industry is growing in a few hot sectors and cooling in others, and nearly everyone is short on workers. This page helps a contractor figure out which side of the line they’re on and what to do about it.

Dr. Paul Borosky, Business Consultant, counts contractors among his 1,000+ clients: owners who are great in the field and buried in paperwork.

Talk to Dr. Paul

Call or text (321) 948-9588.

Last Updated: November 2026

From Dr. Paul’s Fabled Forest Business School Operations, Book 3 of Dr. Paul's Fabled Forest Business School
Operations
Book 3
Why this book: a full schedule only pays when the jobs run on a system.
See It on Amazon
Doctor Owl in Plain English: Construction work in 2027 is uneven. Some sectors are booming and others are slowing, and workers are scarce everywhere. Contractors who come out ahead know which jobs actually made money, protect their margins from material price swings, and grow only as fast as their crew can handle.

How This Guide Works

Need the short version? Doctor Owl covers it above. Skip ahead with the trend list below. Want to see it worked out? Follow Blueprint Bella, a beaver who runs a building company in Dr. Paul’s Fabled Forest Business School Series, as she finds out her proudest job made almost nothing. Her story sits just past trend 1.

What Are the Construction Trends to Watch in 2027?

Here are thirteen, each with moves an owner or project manager can make before the next bid goes out.

1

Which Parts of Construction Are Growing, and Which Are Slowing?

What’s happening

Industry economists describe a split market: data centers and power projects are growing fast, while other nonresidential sectors such as manufacturing have pulled back.

What it means for you

Your year depends on which sectors you work in, not on the national headline.

How to use it
  1. List your last 12 months of work by sector.
  2. Mark which sectors are growing in your area and which are slowing.
  3. Pick one growing sector to learn more about, and find one person who has worked in it.

Read more: Which construction sectors are growing in 2027 →

Read more: Getting into data center work →

From the Fabled Forest

How Would Blueprint Bella Use These Construction Trends?

Doctor Owl is the wise old owl the forest’s owners call when the work is good and the money isn’t. Blueprint Bella, a beaver, runs Bella’s Dam Decent Builds. She finished the otters’ boathouse on time and under budget. Her bank account barely moved.

Bella measures twice, cuts once, and measures again. She had never measured what a job actually earned. Doctor Owl asked: fire or foundation? A job losing money right now is a fire. They put it out with Dr. Paul’s Organize-Plan-Grow™ Strategy.

  1. Organize. Chuck, her chipmunk foreman, pulled the receipts and time sheets for the boathouse. Change orders had eaten the margin. Nobody had billed for them.
  2. Plan. Bella added a rule: no extra work starts until a change order is signed.
  3. Grow. Chuck now reviews cost against bid every Friday, not at the end of the job.

Illustration only: on a $200,000 job, $12,000 of unbilled extras turns a 10% profit into 4%. Billing for them keeps $12,000 that was already earned.

The foundation was hiring. Chuck knew a young carpenter who wanted to learn. Bella finally said yes.

Profit on a $200,000 Job
Extras not billed$8,000 (4%)
Extras billed$20,000 (10%)

Illustration only.

2

How Bad Is the Construction Worker Shortage in 2027?

What’s happening

Associated Builders and Contractors estimates the industry needs to attract 456,000 new workers in 2027, up from 349,000 in 2026.

Construction Workers Needed, 2026 vs. 2027
2026349,000
2027456,000

Source: Associated Builders and Contractors (January 2026).

What it means for you

Data center projects pay more, so they pull from the same small pool of carpenters, electricians, and laborers you need.

How to use it
  1. Sit down with your top two crew members and ask what would make them stay. Act on one answer this month.
  2. Partner with a trade school or apprenticeship program.
  3. Write down how each key job gets done, so a new hire learns faster.

Read more: Hiring construction workers →

3

How Should Contractors Bid When Material Prices Keep Moving?

What’s happening

Tariffs and supply swings keep material prices uncertain from the day you bid to the day you buy.

What it means for you

If the price jumps after you sign, you pay the difference unless the contract says otherwise.

How to use it
  1. Add a material price clause to every bid.
  2. Shorten how long a quote stays good.
  3. Order long-lead materials as soon as the job is signed.

Read more: Bidding jobs when tariffs change prices →

4

Will Interest Rates Change How Much Work Is Out There?

What’s happening

Many projects wait on financing. When rates stay high, owners delay or shrink jobs.

What it means for you

A plan built on rates dropping can leave you short if they don’t.

How to use it
  1. Plan 2027 three ways: slow, expected, and good (scenario planning).
  2. Talk to your bank about your credit line before you need it.
  3. Ask clients early if their project depends on a loan.

Read more: How interest rates affect contractors →

5

How Do You Keep the Backlog From Falling Apart?

What’s happening

Projects slide, pause, and cancel more often when costs and rates are uncertain.

What it means for you

A full board in March can turn into a quiet summer fast.

How to use it
  1. Call every client on the board once a month to confirm start dates.
  2. Keep a short list of smaller jobs you can slot in when a big one slips.
  3. Know exactly what your contract says about cancellations and deposits.

Read more: Protecting your backlog →

Read more: What to do when a client cancels →

6

Can AI Save a Small Contractor Real Time?

What’s happening

Estimating, scheduling, and daily reports are where most small contractors are testing AI tools.

What it means for you

Most tools promise hours back. Few small contractors measure whether they deliver.

How to use it
  1. Pick the one office task that eats the most hours.
  2. Test one tool on that task for 90 days.
  3. Keep it only if you can point to the hours it saved.

Read more: AI tools for small construction companies →

7

Which of Your Jobs Actually Made Money?

What’s happening

Many contractors know their sales. Far fewer know profit by job.

What it means for you

Busy isn’t profitable (revenue vs. profit). The biggest job can be the one that made the least.

How to use it
  1. Track labor, materials, and subs against the bid on every job.
  2. Review it weekly, not after the job closes.
  3. Stop bidding the type of job that keeps losing money.

Read more: Knowing which jobs are profitable →

8

How Do Contractors Grow Without Running Out of Cash?

What’s happening

Retainage, slow payers, and up-front material costs squeeze cash, even in a good year.

What it means for you

You can show a profit and still struggle to make payroll.

How to use it
  1. Bill on time, every time, with every change order attached.
  2. Ask for deposits that cover materials.
  3. Say no to work your crew can’t handle well. Growth needs a foundation first.

Read more: Why profitable contractors run out of cash →

Read more: Knowing if you can handle more work →

9

Is the Remodeling Market Growing Anymore?

What’s happening

Harvard’s Joint Center for Housing Studies expects home improvement spending to stay roughly flat through late 2027, with growth slowing to about 1.5%.

What it means for you

When the market stops growing, remodelers grow by winning a bigger share, not by waiting.

How to use it
  1. Call your past clients twice a year.
  2. Answer new leads faster than the next remodeler.
  3. Offer smaller repair and one-room packages.

Read more: What a flat remodeling market means for you →

10

Will New Home Building Keep Slowing?

What’s happening

The National Association of Home Builders says 2026 will be the second straight year of declining single-family building, with signs of more declines in 2027.

What it means for you

Subs and small builders who depend on new homes feel it first, often as pressure to cut price.

How to use it
  1. Know what share of your revenue comes from new homes.
  2. Never cut price below what the job costs you.
  3. Add remodels, repairs, or light commercial work.

Read more: Working through a home building slowdown →

11

What If Federal Highway Money Stalls?

What’s happening

The federal surface transportation law expired on September 30, 2026. Congress extended it only through December 11, 2026, according to the Congressional Research Service.

What it means for you

Short extensions can make state and county agencies cautious about new bids.

How to use it
  1. Know how much of your work depends on federal dollars.
  2. Chase projects that already have funding.
  3. Build a second source of private work.

Read more: When federal highway money stalls →

12

Are Heat Rules Coming for Your Crew?

What’s happening

OSHA’s proposed heat rule from 2024 is still not final, but OSHA renewed its heat enforcement program in April 2026, and some states have their own rules.

What it means for you

You don’t need a final rule to have a heat problem on a summer job.

How to use it
  1. Check your state’s heat rules for outdoor work.
  2. Write a one-page plan for water, shade, and breaks.
  3. Ease new workers into hot conditions.

Read more: Getting your crew ready for heat rules →

13

Is Shop-Built Work Winning More Bids?

What’s happening

In a 2026 Dodge Construction Network and DEWALT study, 82% of mechanical contractors said fabrication capability is now required to win projects.

What it means for you

Owners and general contractors increasingly expect some work to arrive pre-built.

How to use it
  1. List the assemblies you build the same way on every job.
  2. Build one of them in a shop on your next job.
  3. Compare the time and errors to doing it on site.

Read more: When prefab and shop work start winning bids →

Starting a construction company? Build the numbers first with a construction business plan template. Run HVAC or plumbing? See the 2027 HVAC and plumbing trends.

Real World Help From Dr. Paul

Construction Business Plan Template

Bid-ready plan with a contractor financial model.

See the templates

Business Consulting

On the job site, or on Zoom.

See consulting

Profitability Consulting

See which jobs pay and which drain you.

See profitability help

Small Business Education

Lessons on job costing and cash flow.

Start learning

Where Should a Contractor Start?

  1. Find the job type or bid habit losing you money. That’s your fire.
  2. Pick one thing to build for next year: a crew member, a growing sector, or a better bid. That’s your foundation.
  3. Write both into your 2027 plan with one owner and one date.

Want a second set of eyes? Dr. Paul works with contractors on site, and on Zoom when that’s easier. See how consulting works for contractors.

Which Jobs Are Eating Your Margin?

Book a free 15-minute call with Dr. Paul. Bring a couple of recent bids and what the jobs really cost, if you have them. Just starting your company? Bring your questions. You leave knowing where to look first, and what more help would cost if you want it.

Book a Free 15-Minute Call

Or call or text (321) 948-9588.

What Do Contractors Ask About 2027 Construction Trends?

Is construction going to slow down in 2027?

It depends on the sector. Data centers and power work are growing. Other sectors have slowed. Look at your local market and the work you actually bid.

How do small contractors compete for workers?

Pay matters, but so do steady hours, training, and a foreman people want to work for. Write down how jobs get done so new hires learn faster.

Can a project manager put this to work?

Yes. Job costing, backlog checks, and change orders are things a project manager can run every week and bring to the owner.

Dr. Paul Borosky

About the Author

Dr. Paul Borosky, DBA, MBA, is a business consultant who helps contractors and other trade owners organize the office side, so the work in the field pays the way it should.

Sources

Scroll to Top